Sport field KS Armatura, Kraków 2020, Poland

The realization on the Armatura Kraków sports club's pitches included the assembly of a panel fence with a prefabricated foundation 1.70m high and a gate and entrance gate. The fence is made of 6/5/6mm thick 2D panels. In addition, a 1.70m high galvanized and coated steel mesh fence has been made on the pitch. Total length of the fence is 250 running meter.

Viewed product in implementations