Sport Hall BOSIR Bieruń 2020, Poland

The realization included the supply and installation of curtains fencing the sports hall into the sectors, together with a structure for vertical lifting and lowering of electrically driven curtains. Fencing curtains made up to a height of 4.50m of the material limiting the visibility in blue colour, in the upper part polypropylene net with mesh of 10x10cm. Pilot-controlled curtains.

Viewed product in implementations